New Build School

Details

PROJECT
New Build School

Location
New South Wales

COLLABORATION
Undisclosed

BRIEF
Concrete Colour Match to insitu concrete

Material & Application

Colour matching application onsite by our ECOTONE team to the insitu concrete using ECOTONE Minsil.

Outcome

During construction of this new school build, the in-situ concrete finish did not meet the architect’s design expectations in terms of colour consistency and appearance. To address this, our NSW team was engaged to deliver a more seamless, natural-looking finish. Leveraging our Material Finishes range, we applied ECOTONE Minsil — a high-performance, penetrating mineral stain that chemically bonds with the concrete surface — to enhance the aesthetic while maintaining durability and breathability. The result was a refined, cohesive finish that met the design vision — a job well done by the team.

Testimonial

This was one of those projects where attention to detail really paid off. We worked closely with the site team and adjusted on the fly to get the colour just right. It’s always satisfying to take on a surface that needs improvement and bring it to life with a finish that feels intentional and well-resolved

The ECOTONE team

If you have a similar project in mind, get in touch.

Contact us
Accreditation - Ecotone

Accreditations